Products

Quality In Every Step

Strict Quality Control

Incoming Inspection:Components and finished goods are all inspected during the receiving process. New components and specialized parts also require additional QC inspection and approval.

Operator training:Training is required annually for all employees. Employees are all trained and/or familiar with WHMA A-620 training, which is used in our manufacturing process. Our operators receive ongoing training on operating machines, soldering, crimp quality, and new products.

Detailed Work Instructions:All products are set up with a detailed assembly traveler with instructions on all steps, tools, and tests needed to build it the same every time.

100% Continuity Testing:Products are all tested for continuity after assembly is completed. Hi-pot testing can also be performed when required.

View More

Solution

  • UL Certificate
  • Optical Module (RoHS Certificate)
  • Optical Module (CE Certificate)
  • Network Cable (ROHS Certificate)
  • Network Cable (CE Certificate)
  • IS09001 Quality Management System
  • ISO14001 Environmental Management System